Products Description
On this page
Introduction
QIANGLI supplies certified Railway Fish Plate Joint Bar compliant with EN 14730, TB/T 2345, and UIC 864 standards. All products are manufactured in our ISO 9001:2015 certified facility and undergo ultrasonic testing (UT) for internal defects. Joint bars feature CNC-drilled holes (±0.2mm tolerance) and hot-dip galvanized finish (≥80μm) for long-term performance in harsh environments. Suitable for heavy-haul mainline railways, light rail networks, port crane rails, and industrial sidings.



Key Features
- Material: U71Mn (GB/T 2585) or S355J2+N steel, tensile strength ≥880 MPa, elongation ≥10%
- Precision CNC machining with ±0.2mm hole positional tolerance – verified by CMM inspection
- 100% ultrasonic testing (UT) on critical sections; Mill Test Certificate (MTC) provided per batch
- Hot-dip galvanized (≥80μm per ISO 1461) or Dacromet coating for corrosion resistance
- Compatible with global rail profiles: 30–75 kg/m, QU70/QU80/QU100 crane rails
- ISO 9001:2015 certified production ensures consistent quality
Specifications
Railway Fish Plate Joint Bar Technical Data
| Standard | EN 14730, TB/T 2345, UIC 864 |
| Material | U71Mn (GB/T 2585) or S355J2+N |
| Tensile Strength | ≥880 MPa |
| Elongation | ≥10% |
| Surface Treatment | Hot-dip galvanized (≥80μm) or Dacromet |
| Hole Tolerance | ±0.2 mm (CNC drilled) |
| Rail Compatibility | 30–75 kg/m, QU70/QU80/QU100 |
| Quality Control | 100% UT inspection + CMM dimensional report |
| Certifications | ISO 9001:2015, EN 14730, TB/T 2345 |
| MOQ | 1 metric ton (mixed rail types accepted) |
| Sample Lead Time | 7–10 days |
| Mass Production Lead Time | 25–35 days after PO |
Applications
Our fish plates are installed in mainline railways, urban light rail, port crane systems, and mining sidings. Recent international projects include:
• Nigeria Railway Modernization Project (Lagos–Ibadan Line, 60kg/m rail)
• Saudi Arabia NEOM Light Rail (UIC 54 rail, Dacromet coating)
• Vietnam Urban Metro Line 2 (Hanoi, crane rail QU80)
• Chile Copper Mine Heavy-Haul Line (75kg/m rail, hot-dip galvanized)
All shipments include material traceability and comply with project-specific QA/QC plans.
Why Choose Us
- Factory Scale: 15,000㎡ in-house facility in Zhengzhou, China, with 80+ CNC machines, 3 forging lines, and dedicated galvanizing workshop
- International Experience: Supplied 12,000+ tons of rail fasteners to 30+ countries since 2015, including national rail projects in Africa, Middle East, and Southeast Asia
- Quality Documentation: Every shipment includes MTC, chemical composition report, dimensional inspection report, and packing list
- Third-Party Inspection: We fully support SGS, Bureau Veritas, or Intertek inspections at our factory – typical lead time: 3–5 days after production
- Customization Capability: Provide drawing or sample for non-standard profiles; OEM laser marking available (part number, logo, heat code)
- Flexible Logistics: FOB Qingdao, 20ft container loading ~14 tons, ISPM 15 compliant packaging
Contact & Final Word
MOQ: 1 metric ton (mixed rail types accepted). Sample lead time: 7–10 days. Mass production: 25–35 days after PO. Third-party inspection can be arranged before shipment. Request a quote with your rail drawing or specification sheet.
Contact Us
📧 Email: elinachina@126.com
📞 WhatsApp: +86 156 1771 0309
🌐 Website: www.qianglirailway.com
Hot Tags: railway fish plate joint bar – high-strength rail connector, China railway fish plate joint bar – high-strength rail connector manufacturers, suppliers, factory
